accessibility__skip_menu__jump_to_main

Volltext : Functional scope and model of integrated navigation systems (BSH-Berichte, Nr. 28)

Functionality  level  1

Functionality  level  2

Function

Input  information

Output  information

5.  Check  available  space

5.1  Check  water  depths

5.1.1  Record  data  and  criteria ­


•  Orderly  way  point  list  and  connecting ­
  route  sections
•  Geographical  information
•  Hydrographic  information:  tides
•  Expected  passage  and  arrival
times
•  Expected  draught  of  ship

•  Representation  of  track  calculated  on  the  surrounding ­
  geographical  situation
•  Selection  of  the  relevant  geographical  information:
water  depths
•  Relevant  hydrographic  information:  tides  calculated
on  expected  passage  and  arrival  times

5.1.2  Compare  data  and
criteria

•  Result  information  from  5.1.1

•  Difference  between  expected  water  depths  (taking
tides  into  account)  and  expected  draught  for  the
selected  track

5.1.3  Assess  result  of  comparison ­


•  Result  information  from  5.1.2

•  Statement  whether  the  expected  water  depths  are
permissible
•  Representation  of  “critical  areas”,  stating  cause

5.1.4  Provide  result  of  comparison ­


•  Result  information  from  5.1.3

•  Provision  of  determined  critical  areas  and  their
causes  for  revision  of  the  original  track  data

5.2  Check  channel
widths

5.2.1  Record  data  and  criteria ­


•  Orderly  way  point  list  and  connecting ­
  route  sections
•  Geographical  information
•  Width  of  ship

•  Representation  of  the  track  calculated  on  the  surrounding ­
  geographical  situation
•  Selection  of  the  relevant  geographical  information
or  objects

5.2.2  Compare  data  and
criteria

•  Result  information  from  5.2.1

•  Difference  between  channel  width  and  width  of  ship
for  the  selected  track

5.2.3  Assess  result  of  comparison ­


•  Result  information  from  5.2.2

•  Statement  whether  the  channel  widths  expected
are  permissible
•  Representation  of  “critical  areas",  stating  cause

5.2.4  Provide  result  of  comparison ­


•  Result  information  from  5.2.3

•  Provision  of  determined  critical  areas  and  their
causes  for  revision  of  the  original  track  data

5.3  Check  clearance
heights

5.3.1  Record  data  and  criteria ­


•  Orderly  way  point  list  and  connecting ­
  route  sections
•  Geographical  information
•  Overall  height  of  ship

•  Representation  of  the  track  calculated  on  the  surrounding ­
  geographical  situation
•  Selection  of  the  relevant  geographical  information
or  objects
            
Waiting...

Nutzerhinweis

Sehr geehrte Benutzerin, sehr geehrter Benutzer,

aufgrund der aktuellen Entwicklungen in der Webtechnologie, die im Goobi viewer verwendet wird, unterstützt die Software den von Ihnen verwendeten Browser nicht mehr.

Bitte benutzen Sie einen der folgenden Browser, um diese Seite korrekt darstellen zu können.

Vielen Dank für Ihr Verständnis.