accessibility__skip_menu__jump_to_main

Volltext: North Sea Summer Survey 2014

Profile must be cancelled due to communication problems between SF and deck unit. 
After testing all cables and cable connections it showed up that sea water intruded 
into the termination of the cable at the SF handle. 
SF«< 19:54: End of SF profile 3. 
W5 is working again now and we can start to terminate ihis cable also 
W&S 00:00: Bft. 3, 180°, 1015 hPa, Tw= 18.3 
Wednesday, August 6", 2014 
03:40 — 04:01 Station GN019 (Doggerbank): 
CTD profile with rosette sampler and GoFlo for metals. 
RA: Cs-137: 150 L, Sr-90: 2x35 L, Pu: 100 L, H-3: 1 L. 
07:00: Bft. 4-5, 170°, 1012 hPa, covered, Tw= 15.2 °C. 
Perpared the new termination of the KC winch and tested the link with a 330 kg 
weight. 
11:09 — 11:27 Station GN020 (east of Doggerbank): 
Secchi depth, CTD profile with rosette sampler and GoFlo for metals. 
RA: Cs-137: 150 L. 
W&S 12:00: Bft. 3-4, 185°, 1012 hPa, Tw= 19.5 °C. 
15:08 — 15:28 Station GNO021 (Nordschillgrund): 
Secchi depth, CTD profile with rosette sampler. 
RA: Cs-137: 150 L. 
W&S 19:00: Bft. 4, 160°, 1012 hPa, Tw = 20.4 °C. 
19:43 — 18:01 Station GN022 (Weiße Bank): 
Secchi depth, CTD profile with rosette sampler. 
RA: Cs-137: 150 L. 
T 22:27 — 22:37 Transit station GNO022A: RA: Cs-137: 150 L. 
W&S 23:00: Bft. 4. 180°, 1013 hPa, Tw= 21.2 °C. 
Fr 
Thursday, August 7", 2014 
00:37 — 00:54 Station GNO023: 
CTD profile with rosette sampler. 
RA: Cs-137: 150 L, Sr-90: 2x35 L, Pu: 100 L, H-3: 1 L. 
02:55 — 03:04 Station GNO024: 
CTD profile with rosette sampler 
04:06 — 04:21 Station GN025 (west of Sylt): 
Secchi depth, CTD profile with rosette sampler. 
RA: Cs-137: 150 L, Sr-90: 2x35 L, Pu: 100 L, H-3: 1 L. 
W&S 07:00: Bft. 5-6, 185°, 1011 hPa, covered, Tw= 21.2 °C. 
12:00 — 12:18 Station GN026 (west of Lyngvik): 
Secchi depth, CTD profile with rosette sampler and GoFlo for metals. 
RA: Cs-137: 150 L, Sr-90: 2x35 L. Pu: 100 L, H-3: 1 L. 
1°]
	        
Waiting...

Nutzerhinweis

Sehr geehrte Benutzerin, sehr geehrter Benutzer,

aufgrund der aktuellen Entwicklungen in der Webtechnologie, die im Goobi viewer verwendet wird, unterstützt die Software den von Ihnen verwendeten Browser nicht mehr.

Bitte benutzen Sie einen der folgenden Browser, um diese Seite korrekt darstellen zu können.

Vielen Dank für Ihr Verständnis.