system of the Celtic Explorer, the complete SF-system has to be tested after the
repair by EIVA and the replacement of the communication unit, the new cable of
winch W5 needs to be connected and a plug must be replaced.
After the meeting the CTD-system was completed and successfully tested.
Saturday, August 2"*, 201
W&S 06:30: Bft. 3, 114°, 1010 hPa, clear sky
06:38 Salling.
08:28 — 08:44 Station Stade:
GoFlo for metals und salinity.
RA: Cs-137: 150 L, Sr-90: 2x90 L, Pu: 100 L, H-3: 1 L.
11:38 — 11:52 Station Medem:
GoFlo for metals und salinity
RA: Cs-137: 150 L, Sr-90: 2x35 L, Pu: 100 L, H-3: 1 L.
W&S 12:00: Bft. 4, 120°, 1009 hPa, clear sky.
13:54 - 14:25 Station GN003 (Elbe 1):
Secchi depth and CTD profile with rosette sampler.
RA: Cs-137: 150 L, Sr-90: 2x35 L, Pu: 100 L, H-3: 1 L.
In the afternoon we took a first attempt to terminate the cable of the KC-winch. It took
us about 4 hours, but the attempt fail because we were not able to place the cone in
the center of the SF handle.
W&S 18:15: Bft. 4, 80°, 1006 hPa, clear sky.
18:10 — 18:24 Transit station GNO003A:
RA: Cs-137: 150 L, Sr-90: 2x35 L, Pu: 100 L, H-3: 1 L.
20:43 — 20:57 Station GN007 (Borkumriffgrund):
Secchi depth and CTD profile with rosette sampler.
RA: Cs-137: 150 L, Sr-90: 2x35 L, Pu: 100 L, H-3: 1 L.
The position of GN007 had to be changed to 53° 56‘ N, 006° 25‘ E due to a new wind
park under construction!
W&S 22:00: Bft. 1, variable, 1006 hPa, cloudy.
23:31 — 23:46 Transit station GNO07A:
RA: Cs-137: 150 L, Sr-90: 2x35 L, Pu: 100 L, H-3: 1 L.
a
Sunday, August, 3'%, 2014
02:44 — 03:13 Station GNO008:
CTD profile with rosette sampler and GoFlo for metals
RA: Cs-137: 150 L.
W&S 06:30: Bft. 5. 225°. 1006 hPa. cloudy, Tw = 20.6 °C.