FIELD STUDY
Investigations in Wind Farms
in the North Sea
AU LEE
ae EEE EN E
x
'n total, four ship campaigns were done
Nith the research vessels LUDWIG
>RANDTL (Hereon) and ATAIR (BSH)
around offshore wind farms in the
=xclusive Economic Zone in the German
3ight in the years 2016, 2018, 2019
and 2020.
The study areas were the wind farms in
the area N-4 north of Helgoland and in
the areas N-3 and N-2 north of the East
-risian Islands.
ın addition, punctual investigations
were conducted in the areas N-5/N-6
and at other stations in the coastal sea.
The study areas are shown in Fiqure 1.
During the ship campaigns, the resear-
chers took water samples with Niskin
Jottles and surface sediment samples
with a box corer. As far as possible,
they processed and filtrated the water
samples on board.
The sediment samples were frozen and
sieved in the laboratory of the Helm-
holtz-Zentrum Hereon (< 20 um fraction).
Afterwards, the researchers analysed
the metal content of the samples using
the developed method in the laboratory
of the Helmholtz-Zentrum Hereon.
Study Areas
Jam 2016 (N-4, N-5}
2018 (N-2, N-3, N-4)
2019 (N-2, N-3, N-4, N-6}
2020 (N-3, N-4}
Wind Farm Areas
Aran
Borders
—' Coastal Sea .
—— Continental Shelf / Exclusive Economic Zone
Pl
el
‚Brämerhaven
iedersachser
ans burg
Insum
Schleswi
"a-Holstein
u
Externe Datenquellen: BKG
Seodätisches Datum: ETRS 8‘
fartenproiektion: LAEA
3SH/QM