Secondly, a first integration schedule was drawn, showing
the importance of relying on a common atmospheric
forcing produced operationally (ERA5 from Copernicus
Climate Change service, available since 2019). This
schedule also highlighted three datasets that were limiting
the extension In time of “best estimate” MYPs up to 3
months before present:
- ERA5 (best estimate stops 3 months before present),
- sea level anomalies (orbital corrections available 3-4
months before present),
in situ (delayed time quality control induces a 6-month
delay).
In consequence, the current implementation of regular and
timely deliveries of in situ CORA products, together with
-eprocessed sea level anomaly time extensions in January
and June each year, were organized with the technical
coordination. In parallel, automatic “time extension mode”
is progressively implemented for most REP. When this is in
alace, regular updates of reanalyses can be scheduled
every 6 months, for the best estimate MYPs to reach 1 year
before real time.
2. CONTINUITY AND TIMELINESS: TOWARD
INTERIM PRODUCTION, UP TO ONE MONTH
BEFORE PRESENT
In order to provide reliable trends together with consistent
and recent information on the ocean state, MYPs have to be
zontinuous in time and ideally reach one month before
oresent. Starting 3 months before present, ERA5T
atmospheric fields continue the ERA5 reanalysis by using
the same atmospheric reanalysis system and leveraging
near real-time upstream data. In consequence, the ERA5/
ERAST series allows the provision of a continuous
atmospheric forcing over the past decades up to one month
before present, which in turn can be used by the Marine
Service MYPs. If not homogeneous in terms of quality,
ERA5/ERAST is homogeneous In terms of technica
zharacteristics (grid, variables, frequency, main settings)
As shown in Figure 3, one objective of the cross-cutting
MYP activity was to collaborate with the Marine Service
producers to propose such continuous MYPs, making an
optimal use of the ERAS5/ERAST suite. Depending on
upstream dependencies, production centres will be
implementing scenario (A) or (B) between 2021 and 2024.
HH
c
a7
m
wo
[=
m
Da
Rn
=
wa
zz
—
ı
=
E
a
Best estimate production
using high quality reprocessed / quality controlled inputs
2 Alnterim production
S using DT/NRT Inputs
A. Interim Initialization Is “rolline”
1
3
wm
N
4
=
CM
Best estimate production
sing high quality reprocessed / quality controflen
Interim production
using DT/MRT nous
NDUES
/
=
ns
a
E
—
B. Interim initialization is fixed
L
7}
- Schematic of the organization of the Marine Service multi-vear interim production