See table 1.5: Installation-based grab sampling survey of infauna. 
Figure 2: Sampling design for installation-based effect monitoring. Positions of sampling sta 
tions on a transect behind the pile in the main current direction and on a transect perpendicular 
to the main current direction. On each transect, three stations must be installed at a distance of 
50 m, 75 m, and 100 m with three parallel samples each. 
See table 1.7: Investigation of benthos, habitat structures and habitat types in the con 
text of installation of cable routes for connecting offshore wind farms. 
100 m 100 m 
Station 1 Station 2 Station 3 Station 4 Station 5 
Figure 3: Relative positions of stations within a cross-transect (schematic diagram).
	        
Waiting...

Nutzerhinweis

Sehr geehrte Benutzerin, sehr geehrter Benutzer,

aufgrund der aktuellen Entwicklungen in der Webtechnologie, die im Goobi viewer verwendet wird, unterstützt die Software den von Ihnen verwendeten Browser nicht mehr.

Bitte benutzen Sie einen der folgenden Browser, um diese Seite korrekt darstellen zu können.

Vielen Dank für Ihr Verständnis.