Part B - Technical instructions
39
Method
(continued)
Background noise mea
surements:
• Background noise com
prises the sum of all na
tural sounds in the pro
ject area excluding
construction noise. The
existing sound of distant
ships or operation noise
from neighbouring wind
turbines in the project
area environment should
be treated as background
noise.
Presenta-
tion of
results
The “Measuring instruction for underwater sound measurements” (BSH 2011) applies.
In the event of multiple pile
structures (like jacket or
tripod), the measurement
results for pile driving of
individual piles shall be
evaluated and presented.