Contents
3
Inhalt
Part A - Framework conditions 5
1 Preliminary remarks 5
2 Possible adverse impacts 6
2.1 Construction phase 6
2.2 Operation phase 6
2.3 Decommissioning phase 6
3 Objectives 7
4 Deviation from the StUK, updates 7
5 Positioning of measuring instruments 7
6 Quality assurance 7
7 Decommissioning phase 8
8 Further studies and analyses 8
9 Procedure for the implementation and evaluation of studies relating to the
planning as well as construction and operation of offshore wind farms .... 9
10 Assessment period 10
10.1 Baseline study 10
10.2 Construction phase 10
10.3 Operation phase 10
11 Cluster study 11
12 Assessment region 11
12.1 Project area and assessment area 11
12.1.1 Benthos/fish 11
12.1.2 Avifauna/marine mammals 12
12.2 Reference areas 12
12.2.1 Benthos/fish 12
12.2.2 Avifauna/marine mammals 13
13 Reporting 13
13.1 Baseline study 13
13.2 Monitoring 14
Part B - Technical instructions 15
Features of conservation interest 15
1 Benthos 15
2 Fish 25
3 Avifauna 27
3.1 Resting birds 27
3.2 Migratory birds 30
4 Marine mammals 34
5 Bats 40
6 Landscape 41