Part  B  -  Technical  instructions

35

Baseline  study

Construction
phase

Operation  phase

Timing

At  least  two  consecutive  complete ­
  seasonal  cycles  prior  to  the
start  of  construction.

Throughout  the
entire  construction ­
  phase.

At  least  three  years,  up  to  five
years  if  required,  after  commissioning. ­


Method

Ship  transect  survey:
Ship  based  suveys  of  marine  mammals  take  place  exclusively  within  the  scope  of  the
avifauna  survey  (see  table  3.1.1).

Aircraft  transect  survey:
Digital  video  or  photo  survey  is  carried  out  with  suitable  methods  in  co-ordination  with
the  BSH.  The  digital  aerial  survey  results  are  used  also  for  assessment  of  resting  birds
in  the  assessment  area  (see  table  3.1.1).

Presentation ­
  of
results

Presentation  of  abundance:
•  Seasonal  cycle  sighting  rate  (=  sightings/effective  transect  line)  (per  flight  or
monthly  data  on  relative  frequency).
•  Seasonal  cycle  of  the  number  of  animals  per  km 2  (per  flight  or  monthly  data  on  absolute ­
  frequency)  -  if  the  correction  factor  g(0)  can  be  determined  (under  reserve).
•  Seasonal  cycle  of  group  sizes  (monthly  data  on  single  animals  and  mother/calf
pairs).
•  Rough  characterisation  of  behaviour  (swimming  directions,  behaviour,  association).
•  (Statistical)  presentation  of  occurrence  changes  over  the  assessment  period  (baseline ­
  study-construction  phase-operation  phase,  BACI  design).
Presentation  of  distribution:
•  Distribution  of  sighted  animals  as  well  as  changes  on  the  basis  of  point  maps  (per
flight  or  monthly  summary).
•  Relative  frequency  and  distribution  of  sighted  animals  as  well  as  changes  on  the
basis  of  monthly  or  seasonal  grid  density  maps  (absolute  frequency  under  reserve).
•  Anthropogenic  influences,  such  as  noise  intensive  construction  measures,  must  be
included  in  the  analyses.
•  Movement  of  ships  and  helicopters  due  to  construction/maintenance  activities
should  be  documented  on  the  basis  of  existing  AIS  data  (AIS,  GPS,  VMS)  and
should  be  taken  into  account.
The  POD  survey  results  (see  table  4.2)  must  be  included.
The  sonic  survey  results  (see  table  4.3)  must  be  included.

Literature

Further  reading  on  methodology:
Buckland  et  al.  (2012,  2004),  Gilles  et  al.  (2009),  Scheidat  et  al.  (2008),  Scheidat  et  al.
(2004),  Thomas  et  al.  (2010),  Thomsen  et  al.  (2004).
            
Waiting...

Note to user

Dear user,

In response to current developments in the web technology used by the Goobi viewer, the software no longer supports your browser.

Please use one of the following browsers to display this page correctly.

Thank you.