16
Part B - Technical instructions
Table 1.1: Side scan sonar (SSS) survey of sediment and habitat structure and its
dynamics.
Baseline study
Construction
phase
Operation phase
Objectives
Investigation of ground morphology
and type of substratum for
benthos programme planning,
for determining a suitable reference
area, for interpretation of
benthos data and for demarcation
of habitat types protected
by § 30 BNatSchG.
Verification of images by grab
sampling (ground truthing).
Investigation of ground morphology
and substratum for small and
medium scale detection of relevant
impacts caused by wind turbines.
Scope
SSS studies and ground truthing
at seabed surface shall be conducted
in juncture with the geological
investigations for a geotechnical
survey of wind turbine
and cable route sites.
The investigations shall be carried
out in both the project and
the reference area and have to
take into consideration the
scope of the Geotechnical Site
Investigation Standard (see Table
4 and Table 10, BSH 2013).
The survey results collected in
the context of geological monitoring
must be used for the ecological
evaluation of the sediment
and habitat structure and its dynamics.
SSS studies and ground truthing
at seabed surface shall be conducted
in juncture with the geological
monitoring of wind turbines
and cable routes.
The investigations have to take
into consideration the scope of
the Geotechnical Site Investigation
Standard (see Table 4 and Table
10, BSH 2013).
The survey results collected in the
context of geological monitoring
must be used for the ecological
evaluation of the sediment and
habitat structure and its dynamics.
Timing
Once (see Geotechnical Site
Investigation Standard, Table 4
and Table 10, BSH 2013).
In the third and fifth year of operation
phase, in co-ordination with
the annual geological monitoring
(see Geotechnical Site Investigation
Standard, Table 4 and Table
10, BSH 2013).
Method
Carrying out of SSS studies and
grab sampling (ground truthing)
according to Geotechnical Site
Investigation Standard (see
Table 4 and Table 10, BSH 2013).
Carrying out of SSS studies and
grab sampling (ground truthing)
according to Geotechnical Site Investigation
Standard (see Table 4
and Table 10, BSH 2013).
Presentation
of
results
Compilation of ground morphology and substratum type maps:
• GIS or CAD format (the data must be provided compatible with the xy standard).
• Geodetic reference system: Lat/ Long (WGS 84).
• Illustration of ground truthing stations.
The station grid for the subsequent infauna programme shall be determined on the
basis of the SSS results (see Table 1.3).
Figure 1, p. 42 provides an assessment regarding the occurrence of homogeneous
and heterogeneous sediments in the FEZ of the North Sea.