Part  B  -  Certificates  and  approval  requirements

23

3.4.3.2  Magnetic  fields
3.4.3.2.1  Alternating  current
With  three-conductor  cables,  the  magnetic  fields  almost  cancel  one  another  out.  The  limit  value  of  100
pT  at  50  Hz  required  by  BlmSchV  for  areas  in  which  people  stay  for  long  periods  is  thus  complied  with,
without  restrictions.  The  same  applies  for  coaxially  operated  three-phase  single-conductor  cables  as
well  as  for  three-phase  single-conductor  cables  operated  in  a  bipolar  arrangement.
When  non-stranded  cables  are  used,  it  is  necessary  to  demonstrate  that  they  have  been  laid  in  accordance ­
  with  BlmSchV.

3.4.3.2.2  Direct  current
The  magnetic  fields  almost  cancel  one  another  out  when  bipolar  cables  are  used.  The  limit  value  of
400  pT  at  0  Hz  for  areas  in  which  people  stay  for  long  periods,  as  required  by  BlmSchV,  is  therefore
complied  with  without  restrictions.
When  monopolar  cables  are  used,  it  is  necessary  to  demonstrate  that  they  have  been  laid  in  accordance
with  BlmSchV.

3.4.3.3  Heat  loss  from  power  cables
The  limit  temperature  of  2  K  suggested  from  a  natural  protection  perspective  applies  in  the  EEZ  of  the
North  Sea  and  Baltic  Sea  for  a  reference  point  depth  of  20  cm.
A  calculation  method  shall  be  used  that  has  its  starting  point  in  the  time  average  of  the  cable  losses,  and
goes  on  from  here  to  calculate  the  time  average  of  reference  point  heating.  IEC  60287  can  be  used  as
the  relevant  calculation  method  for  this.  To  take  account  of  full-load  phases  of  wind  farms  lasting  several
days,  transient  heating  is  superimposed  on  this  average  reference  point  heating  (this  transient  heating
resulting  from  a  jump  in  cable  losses  from  the  time  average  to  their  maximum  value).  This  transient  temperature ­
  curve  can  be  calculated  with  reference  to  IEC  publication  IEC  60853-2  £38].  f391  demonstrates
that  both  calculation  methods  suggested  by  IEC  for  cable  technology  are  equivalent  to  the  significantly
more  complex  FE  method  for  all  boundary  conditions  in  question.
When  calculating  the  time  average  for  cable  losses,  it  is  necessary  to  consider  the  parameters  of  the
connected  wind  farm,  the  mean  wind  speed  of  the  location  and  the  resulting  wind  farm  output.  For
three-phase  cables  in  addition,  this  time  average  is  also  determined  by  parameters  of  the  transmission
system.  For  example,  the  length  of  the  cable  route  has  an  influence  on  the  capacitive  currents  supplied
into  both  cable  ends,  while  the  installation  of  compensation  systems  has  a  decisive  influence  on  this
as  well.  A  magnitude  of  0.7  km/W  (T401.  f411.  £42],  f43T)  is  not  exceeded  as  specific  thermal  resistance
values  for  water-saturated  soils.

3.4.4  Cable  laying  and  construction  site  safety
There  are  no  (inter)national  regulations  on  cable  laying  and  repair.  For  this  reason,  this  standard  relies
on  relevant  experience.  With  regard  to  safety  provisions,  reference  is  made  to  the  relevant  international
and  national  safety  regulations,  and  in  particular  to  strict  compliance  with  BGV  C23  F441  in  particular  due
to  the  high  risk  potential  for  diving  work.
            
Waiting...

Nutzerhinweis

Sehr geehrte Benutzerin, sehr geehrter Benutzer,

aufgrund der aktuellen Entwicklungen in der Webtechnologie, die im Goobi viewer verwendet wird, unterstützt die Software den von Ihnen verwendeten Browser nicht mehr.

Bitte benutzen Sie einen der folgenden Browser, um diese Seite korrekt darstellen zu können.

Vielen Dank für Ihr Verständnis.