Objekt : Standard Design

84

Part  B  -  Verifications  and  approval  requirements

5.3.6  Installation  manual
The  requirements  for  the  installation  manual  are  stipulated  in  chapter  B2.3.4.

5.3.7  Documents  to  be  submitted  to  apply  for  the  3 rd  release

[Doc.  No.  530]
[Doc.  No.  531]
[Doc.  No.  532]
[Doc.  No.  533]
[Doc.  No.  534]

Inspection  report  on  the  updated  concepts  (please  refer  to  chapter  5.3.5)
Installation  manual  (please  refer  to  chapter  B2.3.6)
Inspection  report  pertaining  to  Doc.  No.  531
Decommissioning  concept  (feasibility  of  decommissioning)
Inspection  report  pertaining  to  Doc.  No.  533

5.4  Implementation
5.4.1  Preliminary  remarks
The  inspected  concept  for  the  trial  (please  refer  to  chapter  5.3.5)  shall  be  updated  for  the  detailed ­
  planning.
The  plan  of  the  tests  and  trials  shall  be  subdivided  into  three  phases:
•  Factory  acceptance  test  and  factory  trial  (FAT)
•  Onshore  trial  (mechanical  completion  +  FIAT)  and
•  Offshore  commissioning.
In  this  phase  of  the  project,  inspection  and  monitoring  services  shall  be  carried  out  primarily
onshore,  if  possible.
The  appointed  inspector  shall  draw  up  a  monitoring  schedule  on  the  basis  of  the  planning  for
tests  and  trials.  The  monitoring  schedule  shall  be  coordinated  with  the  applicant  and  the
manufacturers  before  the  work  starts.

5.4.2  Requirements  and  necessary  verifications
All  requirements  placed  on  the  implementation  phase  are  regulated  in  chapter  B1.3.4.
The  inspections  which  must  be  carried  out  during  transport  are  listed  in  the  installation
manual.
The  results  of  the  inspections  shall  be  described  and  assessed  by  the  appointed  inspector  in
the  form  of  a  comprehensible  and  plausible  monitoring  report.
5.4.3  Documents  to  be  submitted  to  apply  for  operating  release
[Doc.  No.  540]  Inspection  reports  and  certificates  of  conformity
•  For  production  monitoring
•  Transport  and  installation  monitoring  and
•  Monitoring  of  the  commissioning  phase
            
Waiting...

Nutzerhinweis

Sehr geehrte Benutzerin, sehr geehrter Benutzer,

aufgrund der aktuellen Entwicklungen in der Webtechnologie, die im Goobi viewer verwendet wird, unterstützt die Software den von Ihnen verwendeten Browser nicht mehr.

Bitte benutzen Sie einen der folgenden Browser, um diese Seite korrekt darstellen zu können.

Vielen Dank für Ihr Verständnis.