Part B - Verifications and approval requirements
5.3.6 Installation manual
The requirements for the installation manual are stipulated in chapter B2.3.4.
5.3.7 Documents to be submitted to apply for the 3 rd release
[Doc. No. 530]
[Doc. No. 531]
[Doc. No. 532]
[Doc. No. 533]
[Doc. No. 534]
Inspection report on the updated concepts (please refer to chapter 5.3.5)
Installation manual (please refer to chapter B2.3.6)
Inspection report pertaining to Doc. No. 531
Decommissioning concept (feasibility of decommissioning)
Inspection report pertaining to Doc. No. 533
5.4 Implementation
5.4.1 Preliminary remarks
The inspected concept for the trial (please refer to chapter 5.3.5) shall be updated for the de
tailed planning.
The plan of the tests and trials shall be subdivided into three phases:
• Factory acceptance test and factory trial (FAT)
• Onshore trial (mechanical completion + FIAT) and
• Offshore commissioning.
In this phase of the project, inspection and monitoring services shall be carried out primarily
onshore, if possible.
The appointed inspector shall draw up a monitoring schedule on the basis of the planning for
tests and trials. The monitoring schedule shall be coordinated with the applicant and the
manufacturers before the work starts.
5.4.2 Requirements and necessary verifications
All requirements placed on the implementation phase are regulated in chapter B1.3.4.
The inspections which must be carried out during transport are listed in the installation
manual.
The results of the inspections shall be described and assessed by the appointed inspector in
the form of a comprehensible and plausible monitoring report.
5.4.3 Documents to be submitted to apply for operating release
[Doc. No. 540] Inspection reports and certificates of conformity
• For production monitoring
• Transport and installation monitoring and
• Monitoring of the commissioning phase