Full text: Standard Design

Part B - Verifications and approval requirements 
75 
4.5.2 Documents to be submitted when applying for an extension of the operating per 
mit 
[Doc. No. 450] Annual verification report by the appointed inspector summarising all the 
RNAs (summary of the results of the periodic inspections, please refer to 
chapters B1.3.5 and B2.5.3) 
[Doc. No. 452] Certificate of conformity pertaining to the operation of all the RNAs at the 
wind farm (incl. the periodic inspections). 
4.6 Decommissioning phase 
The requirements pertaining to decommissioning are specified in chapter B2.6.
	        