74
Part B - Verifications and approval requirements
Assembly
Test item
Rotor blade
Damage to the surface, cracks, structural inconsis
tencies of the blade body. (Inspection from a lifting
platform or climbing device or pulley system: Visual
assessment and inspection of the structure using
suitable processes (e.g. knocking, ultrasound)). Tigh
tening torque of screw connections. Damage to light
ning protection equipment.
Drive train
Leaks, unusual noises, condition of the corrosion
protection, lubrication condition, tightening torque of
screw connections. Condition of the gear unit
Nacelle and power and torque-transmitting
components
Corrosion, cracks, unusual noises, lubrication condi
tion, tightening torque of screw connections
Hydraulic system, pneumatic system
Damage, leaks, corrosion, function
Safety equipment, measuring sensors and
brake systems
Function checks, compliance with limit values,
damage, wear
Documents
Completeness, compliance with regulations,
implementation, test documents, regular undertaking
of maintenance, possibly including authorised
modifications/repairs.
Table 4-1 : Minimum requirements pertaining to the periodic inspection of the RNAs of offshore
wind turbines.
4.5.1 Requirements and required verifications
4.5.1.1 Evaluation criteria for the periodic inspections
The evaluation criteria for the periodic inspections shall be defined in the test and inspection
plan according to the respective installation and site.
4.5.1.2 Scope of the periodic inspections
The stability against collapse of the RNA, including the function of the safety and brake sys
tems, shall be inspected. The items covered by the periodic inspections are detailed in chap
ter B2.5.3 (support structures for the RNA) and in Table 4-1 above.
4.5.1.3 Periodic inspections - inspection intervals
The periodic inspections of the RNA shall be carried out on at least 25 % of the wind turbines
at the offshore wind farm so that all the RNAs are inspected in a four-year cycle. This period
commences when trial runs are started.
Based on empirical values and verification of the status through respective inspections, it is
possibly to deviate from the prescribed annual test intervals in consultation with the appointed
inspector and the BSH.