Part  B  -  Verifications  and  approval  requirements

[Doc.  No.  342]
[Doc.  No.  343]

Supplementary  reports  to  the  geotechnical  design  report  and  other  verified
reports  in  compliance  with  BHS  stipulations
Verification  report(s)  pertaining  to  Docs.  No.  340,  341  and  342.

3.5  Operating  phase
3.5.1  Preliminary  remarks
Foundation  elements  are  not  subject  to  any  specific  operating  requirements  during  the  operation ­
  of  the  installation  once  they  have  been  appropriately  and  professionally  installed.
In  order  to  monitor  the  overall  behaviour  of  the  foundation  elements  during  the  operating
phase,  parameters,  such  as  shifting,  deformation,  component  stress  and  frequencies,  shall  be
measured  and  recorded  (monitoring)  in  the  area  of  the  foundation  elements  at  representative
offshore  wind  turbine  sites.  These  sites  shall  be  selected  in  coordination  with  the  geotechnics
expert.  Based  on  these  results,  the  compliance  of  the  interaction  between  the  subsoil  and  the
structure  with  the  design  and  planning  results  shall  be  regularly  examined  and  assessed  by  an
expert  within  the  scope  of  the  periodic  inspections.
For  all  types  of  offshore  structures,  special  requirements  resulting  from  specific  installation
results  or  special  demands  as  a  result  of  innovative  new  foundation  principles  may  arise  during ­
  the  normal  operations.
For  measures  introduced  during  normal  operations,  the  level  of  stability  of  the  foundation  elements ­
  against  collapse  is  generally  verified  using  the  observation  method.

3.5.2  Technical  codes  of  practice
The  geotechnical  codes  of  practice  to  be  applied  during  the  operating  phase  are  derived  from
DIN  EN  1997  (EC  7)  and  the  references  contained  therein  and  comply  with  the  features  of  the
foundation  elements  contained  in  the  specific  design  documentation.

3.5.3  Requirements  and  required  verifications
The  requirements  and  required  verifications  shall  comply  with  the  respective  project-specific
stipulations  resulting  from  the  approvals,  permits,  authorisations  and  orders  issued  by  the
BSH.

3.5.4  Documents  to  be  submitted  for  maintaining  the  operating  permit
The  documents  to  be  submitted  with  respect  to  maintaining  the  operating  permit,  shall  comply ­
  with  the  respective  project-specific  stipulations  resulting  from  the  approvals,  permits,  authorisations ­
  and  orders  issued  by  the  approval  authority  responsible  for  granting  the  operating
permit.
            
Waiting...

Nutzerhinweis

Sehr geehrte Benutzerin, sehr geehrter Benutzer,

aufgrund der aktuellen Entwicklungen in der Webtechnologie, die im Goobi viewer verwendet wird, unterstützt die Software den von Ihnen verwendeten Browser nicht mehr.

Bitte benutzen Sie einen der folgenden Browser, um diese Seite korrekt darstellen zu können.

Vielen Dank für Ihr Verständnis.