Full text: Standard Design

Part B - Verifications and approval requirements 
65 
3.3.2.5.5 Additional geotechnical information and verifications 
All presumptions made with respect to the devised foundation elements and the precondi 
tions for realising the construction project shall be accordingly specified. 
All geotechnical verifications which will have to be presented for the devised foundation ele 
ments during the installation and operating phases (please refer to chapters B3.4.4 and B3.5.4) 
shall be accordingly specified. 
3.3.3 Geotechnical documents to be submitted 
3.3.3.1 Geotechnical design report 
The design, calculations and dimensioning of the foundation elements shall be accordingly 
represented in the geotechnical design report in a verifiable manner. The formal and content 
requirements set down in DIN EN 1997 (EC 7) placed on the foundations of offshore structures 
are detailed more precisely in the following: 
The Geotechnical Report of the expert for geotechnics compiled in accordance with the BSH 
Standard Ground Investigations represents the basis on which the Geotechnical Design Re 
port is based but is not an integral part of this report. The Geotechnical Design Report con 
tains all relevant information and representations with respect to the design of the foundation 
elements, in particular 
• The presentation of the assumptions made based on the scope for making selections and 
decisions provided by the applicable standards, and the justification thereof. These include, 
in particular 
- The selection of subsoil parameters used 
- Where necessary, reasons for deviations in the applied subsoil parameters from those 
detailed in the geotechnical report 
- The determination of the load combinations relevant to the calculations 
- The classification of the load combinations in different calculation situations 
- The assignment of safety factors to loads and resistances and 
- The representation of the implementation and assessment of component tests, e. g. pile 
load tests, incl. specific representation of the verification methods used 
• The representation of the engineering models used for the verifications, including the model 
assumptions and simplifications used 
• The representation of the calculation processes used for the verifications, including their 
implicit prerequisites 
• The values of the subsoil parameters used for the verifications 
• The derivation of the values for model parameters additionally required 
• The results of the load-bearing capacity verifications 
• The results of the serviceability verifications 
• The representation of the appropriateness and the adequacy of the examined ultimate limit 
state 
• The representation of the appropriateness and the adequacy of the examined serviceability 
limit state 
• Recommendations for measurements conducted on the structure and on the subsoil (mo 
nitoring), as well as
	        
Waiting...

Note to user

Dear user,

In response to current developments in the web technology used by the Goobi viewer, the software no longer supports your browser.

Please use one of the following browsers to display this page correctly.

Thank you.