r\3
CT)
Phase
Objectives and measures
Chapter
Documents to be compiled by the approval
holder and submitted to the BSH
Documents to be compiled
by the appointed inspector
and submitted to the BSH
Approval
authority
Implementation
Production and assembly monitoring,
Examination of the QM certificates provided
by the manufacturers
Compilation of NOT reports, incl. monitoring
of the transport, erection and installation
and commissioning phases
2.4
Inspection reports and certificates
of conformity pertaining
to the monitoring of the production
and assembly, transport,
installation and commissioning
phases
Plausibility
check
Operating release
(poss.
incl. special
measures)
As-built documentation
2.4.2.3
As-built construction drawing
Verification report and certificate
of conformity
Operations monitoring
1.3.5
2.4.3
2.5.3
Test and inspection plan for periodic inspections
Verification report and certificate
of conformity
2.4.3
Operations manual
Verification report and certificate
of conformity
Project certificate
Operation
Periodic inspections
1.3.5 2.5
3.5 5.5
Verification report and certificate
of conformity
Plausibility
check
Maintenance
of the operating
permit
Decommissioning
Decommissioning plan
2.6 3.6
Detailed description of the decommissioning
procedure
Verification report and certificate
of conformity
Plausibility
check
Declaration
confirming
that decommissioning
and disposal
have been
carried out
correctly
Monitoring of the decommissioning phase,
the disassembly of the components, their
transport and disposal
2.6
Disposal verifications
Inspection reports and certificate
of conformity
Table 1-2: Timescale for offshore statios
Part B - Verifications and approval requirements