r\3
CT)
Phase
Objectives and measures
Chapter
Documents to be compiled by the appro
val holder and submitted to the BSH
Documents to be compiled
by the appointed inspector
and submitted to the BSH
Approval
authority
Implemen
tation
Production and assembly monitoring,
Examination of the QM certificates provided
by the manufacturers
Compilation of NOT reports, incl. monitoring
of the transport, erection and installation
and commissioning phases
2.4
Inspection reports and certifi
cates of conformity pertaining
to the monitoring of the pro
duction and assembly, trans
port, installation and commis
sioning phases
Plausibility
check
Operating re-
lease (poss.
incl. special
measures)
As-built documentation
2.4.2.3
As-built construction drawing
Verification report and certifi
cate of conformity
Operations monitoring
1.3.5
2.4.3
2.5.3
Test and inspection plan for periodic ins
pections
Verification report and certifi
cate of conformity
2.4.3
Operations manual
Verification report and certifi
cate of conformity
Project certificate
Operation
Periodic inspections
1.3.5 2.5
3.5 5.5
Verification report and certifi
cate of conformity
Plausibility
check
Maintenance
of the opera
ting permit
Decommis
sioning
Decommissioning plan
2.6 3.6
Detailed description of the decommissio
ning procedure
Verification report and certifi
cate of conformity
Plausibility
check
Declaration
confirming
that decom
missioning
and disposal
have been
carried out
correctly
Monitoring of the decommissioning phase,
the disassembly of the components, their
transport and disposal
2.6
Disposal verifications
Inspection reports and certifi
cate of conformity
Table 1-2: Timescale for offshore statios
Part B - Verifications and approval requirements