Phase
Objectives and measures
Chapter
Documents to be compiled by the appro
val holder and submitted to the BSH
Documents to be compiled
by the appointed inspector
and submitted to the BSH
Approval
authority
Design
Update of the basic documents through
more detailed specification of the concepts:
• Specification of the fire compartments of
the operational structure (topside)
• Description of the active and passive fire
fighting systems
• Specification of the transport and access
systems for the support structure and
operational structure installations
• Update of the operational concept and
offshore station design
• Finalisation of the fire protection concept
for the offshore station
• Finalisation of the equipment concept for
the offshore station
• Implementation of the structural require
ments pertaining to the offshore station
based on the safety and functional de
mands resulting from the risk assessment
• Finalisation of the final transport and ac
cess concept
5.3
Verification report (based on
the basic documents)
Plausibility
check
3 rd release
(poss. incl.
special mea
sures)
Final installation design
2.3.4
Installation manual
Verification report
Finalisation of the final design for installing
the offshore station, incl.:
• Compilation of a commissioning concept
• Presentation of reports on all the tests
conducted
• Detailed description of the transport and
installation procedures
Compilation of an implementation concept
• Compilation of the towing procedures
• Transport and installation procedures
2.3.5
Verification report
Decommissioning concept
1.3.3
Decommissioning concept
Verification report and certifi
cate of conformity
r\3
en
Part B - Verifications and approval requirements