r\3
4^
Phase
Objectives and measures
Chapter
Documents to be compiled by the appro
val holder and submitted to the BSH
Documents to be compiled
by the appointed inspector
and submitted to the BSH
Approval
authority
Develop
ment
Compilation of basic documents for the fun
damental concept (functional description) of
the offshore station with respect to its
usage, safety and marine environmental
protection measures
5.1
Verification report (based on
the basic documents)
Plausibility
check
1 st release
(poss. incl.
special mea
sures)
Compilation of the site-specific data Site as
sessment of the foundation structure
1.3.2 2.2
3.1 3.2
Geological report (in as far as this is requi
red by the Standard Ground Investigations)
Subsoil inspection report
Subsoil and foundations survey
Meteorological and oceanographic expert
opinion
Verification report and certifi-
cate of conformity
Determination of the design basis
2.2 5.2
Design basis
• Specification of the hierarchy of norms
• Description of the functional specifica
tions and requirements placed on the pri
mary and secondary support structures
Preliminary design of the support structure
(incl. verifiable measurements of the planned
foundation structures for the EIA)
2.2
Preliminary design and support structure
Verification report (technical
statement)
Design
Update of the basic documents through the
provision of detailed concepts:
• Load handling concept
• Fire and explosion protection concept
• Access concept
• Room utilisation plan
5.3.1
Verification report (based on
the basic documents)
Plausibility
check
2 nd release
(poss. incl.
special mea
sures)
Update of the site-specific data
3.3
Ground investigation report
Subsoil and foundations survey
Geotechnical design report
Ross, report on the implementation of a dy
namic pile load test
Ross, confirmation of the feasibility of a dy
namic pile load test
Verification report and certifi
cate of conformity
Update of the design basis
2.3
Update of the design basis
Verification report and certifi
cate of conformity
Final design of the primary and secondary
support structures
2.3
Final design of the primary and secondary
support structures
Verification report and certifi
cate of conformity