Volltext : Standard Design

102

Appendices

3-II.3.2  Cyclic  loading  transverse  to  the  pile  axis
Lateral  cyclic  loading  of  pile  foundations  leads  to  a  deflection  of  the  pile  head  which,  if  large
enough,  places  considerable  stress  on  the  soil  close  to  the  pile  head,  with  pile  deflection  increasing ­
  with  the  number  of  load  cycles.  Also,  bedding  resistance  (bedding  capacity  and  bedding ­
  stiffness)  may  be  reduced,  if  cyclic  loading  causes  an  accumulation  of  pore  water  excess
pressure.
Moreover,  in  cohesive  soils  under  water,  permanent  soil  deformation  may  cause  gap  formation ­
  between  pile  and  soil,  and  a  destabilisation  of  the  near-surface  area,  which  reduces  the
bearing  capacity  of  laterally  loaded  piles.
Notes  on  the  assessment  of  the  serviceability  of  piles  that  are  mainly  loaded  transverse  to  the
pile  axis  can  be  found  in  EA-Pfähle.
In  order  to  verify  the  ultimate  limit  state  for  the  lateral  bearing  capacity  of  a  pile,  it  is  necessary
to  determine  the  expected  reduction  of  mobilisable  bedding  resistance  taking  into  account
the  pile  system  used  (type,  diameter),  type  of  soil  and  number  of  load  cycles.  The  assessment
can  be  made  either  on  the  basis  of  experience  or  can  be  based  on  the  results  of  suitable  cyclic ­
  laboratory  tests  taking  into  account  changes  of  pore  water  pressure.  Bearing  capacity  can
be  verified  on  the  basis  of  bedding  resistance,  which  may  be  diminished,  applying  the  method
described  in  chapter  13  of  EA  Pfähle,  and  using  the  “p-y  method”.  In  verifying  serviceability
and  load  capacity,  application  areas  and  limits  of  the  methods  chosen  shall  be  taken  into  account. ­

The  influence  of  changes  of  pore  water  pressure  on  the  load  bearing  capacity  shall  be  examined ­
  and  taken  into  account,  where  applicable.

Appendix  3-MI  Dynamic  pile  load  tests
According  to  DIN  EN  1997-  (EC  7-1)  and  DIN  1054,  the  external  axial  bearing  capacity  of  foundation ­
  piles  is  verified  by  means  of  pile  load  tests.  Therefore,  dynamic  pile  load  tests  are  required ­
  to  verify  the  bearing  capacity  of  offshore  wind  turbine  foundations,  where  piles  are
predominantly  subject  to  axial  loading.
DIN  EN  1997-1  (EC  7-1)  and  DIN  1054,  with  reference  to  EA-Pfahle,  describe  the  methods  to
be  used  in  conducting  dynamic  pile  load  tests  and  evaluating  and  interpreting  the  results.  The
geotechnical  planning  expert  shall  determine  the  number  and  the  locations  of  the  pile  test
loads  to  be  conducted  in  accordance  with  EA-Pfahle.  Generally,  dynamic  pile  load  tests  shall
be  carried  out  at  all  offshore  stations  and  at  least  10  %  of  the  offshore  wind  turbine  locations,
which  should  include  at  least  two  locations  for  each  geotechnical  location  type  found  in  the
area  of  the  wind  farm.
The  concept  for  the  dynamic  pile  load  tests  (number,  locations)  shall  be  developed  by  the
geotechnical  planning  expert  and  submitted  with  the  application  documents  for  the  2 nd  release. ­
  The  concept  should  specify  the  type  and  scope  of  tests  to  be  carried  out  and  the  way
in  which  the  test  results  are  to  be  applied  to  the  entire  construction  site.  The  following  documents ­
  are  to  be  included:  A  report  from  the  company  conducting  the  dynamic  pile  load  tests,
incl.  information  on  the  planned  sensors,  their  installation  and  the  planned  cable-laying  procedure, ­
  as  well  as  a  confirmation  with  regard  to  the  feasibility  of  the  dynamic  pile  load  tests
compiled  by  the  author  of  the  design  which  gives  consideration  to  all  the  relevant  impacts  on
the  foundation  during  the  installation  process  (e.g.  taking  into  account  a  cofferdam  for  installing ­
  the  sensors  and  the  laying  of  the  cables).
            
Waiting...

Nutzerhinweis

Sehr geehrte Benutzerin, sehr geehrter Benutzer,

aufgrund der aktuellen Entwicklungen in der Webtechnologie, die im Goobi viewer verwendet wird, unterstützt die Software den von Ihnen verwendeten Browser nicht mehr.

Bitte benutzen Sie einen der folgenden Browser, um diese Seite korrekt darstellen zu können.

Vielen Dank für Ihr Verständnis.