Volltext : Standard ground investigations

Part  C  -  Minimum  Requirements  on  geotechnical  investigations

25

In  many  project  areas  within  the  German  Baltic  Sea  which  have  a  predominantly  cohesive  subsoil
layers  as  well  as  soils  similar  to  solid  rock  (e.g.  chalk),  boreholes  are  necessary  to  obtain  representative ­
  sediment  samples  at  all  sites  within  the  course  of  preliminary  exploration.  The  need  for
cone  penetration  testing  is  determined  by  the  geotechnical  expert  on  a  case-by-case  basis.
The  exploration  depth  of  borings  and  cone  penetration  tests  shall  be  sufficient  to  allow  possible ­
  foundation  types  to  be  assessed  within  the  framework  of  preliminary  design  planning.
Therefore,  the  investigation  depth  has  to  be  determined  by  the  geotechnical  expert,  in  co-ordination ­
  with  the  design  engineer.
It  is  recommended  that  the  survey  concept  is  agreed  upon  with  the  certifying  body  within  the
meaning  of  the  Standard  Design.
2.3.2  Main  geotechnical  investigation
In  the  course  of  main  geotechnical  investigations  (step  5,  Part  A,  Table  1),  at  least  one  site  investigation ­
  has  to  be  carried  out  at  each  turbine  site.  This  may  be  sufficient  with  homogeneous ­
  soil  conditions.  However,  when  soil  conditions  are  inhomogeneous  or  otherwise  unfavourable, ­
  or  in  case  of  tripod,  jacket  or  gravity  foundations,  a  larger  number  of  site  investigations
is  normally  required  for  execution  planning.  The  geotechnical  expert  shall  decide  in  this  case.
The  investigation  method  to  be  used  (drilling,  cone  penetration  or  a  combination  of  both)  shall
be  determined  by  the  geotechnical  expert  taking  into  account  the  expected  soil  strata,  the
results  of  preliminary  investigation,  and  the  foundation  type.
Different  regulations  are  illustrated  for  main  geotechnical  investigation  of  offshore  stations  in
Part  C,  section  2.3.3.
The  investigation  depth,  as  a  minimum,  shall  meet  the  requirements  of  design  planning  and
thus  has  to  be  determined  by  the  geotechnical  expert,  in  co-ordination  with  the  design  engineer ­
  (see  chapter  2.3.1).
2.3.3  Special  regulations  for  offshore  stations
Usually  a  minimum  of  four  ground  investigations  for  foundation  structures  are  carried  out  in
the  corner  areas  of  the  structure  or  in  all  sites  of  the  foundation  elements  (piles).  The  respective ­
  distance  between  individual  investigations  and  the  assigned  foundation  element  (pile)
must  be  no  more  than  30  m  for  large  foundation  structures,  otherwise  additional  explorations
must  be  arranged.
For  offshore  stations  (as  well  as  for  external  converter  stations  as  well  as  substations  or  other
stations  within  the  wind  farm)  the  steps  for  preliminary  and  main  investigation  (development  and
construction  phase  -  see  Part  A,  Section  2)  can  be  formally  summarised.  The  associated  reports
should  be  submitted  to  the  Federal  Maritime  and  Hydrographic  Agency  in  a  certified  manner  for
the  second  release  at  the  latest.  If  necessary,  submission  of  the  first  release  is  also  possible.
Also,  the  guidelines  apply  in  accordance  with  Sections  2.3.1  and  2.3.2.
2.3.4  Supplementary  investigations
Supplementary  investigations  or  field  tests  such  as  e.  g.  pile  driving  or  pile  load  tests  may  become ­
  necessary  as  a  result  of  the  design  work,  the  geotechnical  verification  of  the  initial  design ­
  or  the  invitation  to  tender,  especially  with  separate  proposals.  The  same  principles  as  for
site  investigations  apply  here.
The  findings  of  the  geotechnical  investigation  should  be  compared  with  the  findings  of  the
geophysical  survey,  and  the  geophysical  measurements  should  be  subsequently  interpreted
on  the  basis  of  the  geotechnical  investigation.
            
Waiting...

Nutzerhinweis

Sehr geehrte Benutzerin, sehr geehrter Benutzer,

aufgrund der aktuellen Entwicklungen in der Webtechnologie, die im Goobi viewer verwendet wird, unterstützt die Software den von Ihnen verwendeten Browser nicht mehr.

Bitte benutzen Sie einen der folgenden Browser, um diese Seite korrekt darstellen zu können.

Vielen Dank für Ihr Verständnis.