accessibility__skip_menu__jump_to_main

Volltext : Standard Design

42

Part  В  -  Verifications  and  approval  requirements

DIN  EN  ISO  19905-1
ISO/DIS  29400
DIN  EN  1990
DNV-OS-H101
GL-IV-7

Petroleum  and  natural  gas  industries  -  Site-specific  assessment  of
mobile  offshore  units  -  Part  1  :  Jack-ups
Ships  and  marine  technology  -  Offshore  wind  energy  -  Port  and  marine ­
  operations
Basis  of  structural  design
DNV  Offshore  Standard  -  Marine  Operations,  General
GL  Rules  for  the  Certification  and  Construction,  IV  Industrial  Services,
Part  7  Offshore  Substations

GL-IV-6
API  RP  2A-WSD
GL-IV-2

GL  Rules  for  Classification  and  Construction,  IV  Industrial  services,
Part  6  Offshore  Technology
American  Petroleum  Institute,  Recommended  Practice  -  Planning,  Designing, ­
  and  Constructing  Fixed  Offshore  Platforms  -  Working  Stress
Design
GL  Rules  and  Guidelines,  IV  Industrial  Services,  Part  2  Guideline  for
the  Certification  of  Offshore  Wind  Turbines

DNV-OS-J101  DNV  Offshore  Standard  -  Design  of  Offshore  Wind  Turbine  Structures
DNV-OS-J201  DNV  Offshore  Standard  -  Offshore  Substations  for  Wind  Farms

Deviations  from  the  German  and  international  standards  and  guidelines  listed  above  shall  be
submitted  to  the  BSH  for  approval.
Should  a  machine  be  used  outside  its  normal  field  of  application  for  offshore  activities,  the
suitability  of  this  machine  shall  be  verified  and  certified  in  accordance  with  the  German  Machine ­
  Ordinance.
The  special  codes  of  practice  to  be  observed  with  respect  to  monitoring  the  production  phase
are  listed  in  chapter  B2.4.2  ff.

2.4.2  Requirements  and  required  verifications
All  equipment,  procedures  and  materials  used  in  offshore  work  shall  comply  with  the  German,
resp.  European  standards,  provisions  and  similar  with  respect  to  safety,  environmental  protection ­
  etc.
Where  equipment,  procedures  or  materials  are  used  that  are  not  in  compliance  with  a  recognised ­
  standard,  appropriate  approval  shall  be  obtained  from  the  approval  authority.  To  this
end,  the  approval  authority  may  appoint  a  suitable  expert  to  carry  out  this  inspection,  resp.
recognise  verifications  provided  by  third  party  experts.  Should  a  machine  be  used  outside  its
normal  field  of  application,  the  suitability  of  this  machine  shall  be  verified  in  accordance  with
the  German  Machine  Ordinance.
Copies  of  the  installation  manual  shall  be  available  for  review  at  all  times  -  with  a  minimum  of
one  copy  in  the  construction  management’s  marine  office  and  one  at  the  land  base,  as  well  as
copies  at  all  other  locations  deemed  suitable.
The  applicant  shall  provide  evidence  that  an  effective,  certified  management  system  in  accordance ­
  with  ISO  9001,  Quality  management  systems  -  Requirements,  is  in  place.  Alternatively, ­
  should  this  certification  not  be  currently  available,  the  quality  management  system  can
be  inspected  on  the  basis  of  ISO  9001  by  the  appointed  inspector.
            
Waiting...

Nutzerhinweis

Sehr geehrte Benutzerin, sehr geehrter Benutzer,

aufgrund der aktuellen Entwicklungen in der Webtechnologie, die im Goobi viewer verwendet wird, unterstützt die Software den von Ihnen verwendeten Browser nicht mehr.

Bitte benutzen Sie einen der folgenden Browser, um diese Seite korrekt darstellen zu können.

Vielen Dank für Ihr Verständnis.