Part B - Verifications and approval requirements
39
Special points to be considered in connection with the structural design of steel structures:
• The special corrosion risks connected with using stainless steel components shall be ac
cordingly taken into account.
• The rotor/nacelle assembly and their respective equipment (non-load-bearing steel compo
nents (secondary steel), such as boat landings, platforms and ladders) shall be connected
to the lightning protection and earthing system.
Special points to be considered in connection with the structural design of solid structures:
• Care shall be taken to route lightning protection and earth cables through the concrete
structures for dissipation into the subsoil (e. g. connection to an existing reinforcement but
on no account to a prestressed reinforcement).
• The special corrosion risks connected with using stainless steel components shall be ac
cordingly taken into account.
• The structural design of reinforced concrete and prestressed concrete reinforcements shall
take account of the aspects of minimum and crack reinforcement, rod and edge spacings,
concrete covering, bending radii, anchoring and encroachment lengths, anchoring points
for the transverse force reinforcement as well as corrosion protection measures for pres
tressed elements.
• In the case of a heavyweight foundation, a study on the required preparation of the seabed
shall be provided at the 1 st release stage. When compiling the EIA, the spacial delimitation
(taking the ensuing slope angle into account) and the preparatory construction measures
shall be described with such reliability that they can be used as a basis for the sediment
management concept and sediment drift forecast.
Please refer to chapter B5.3.3 for more information on the requirements pertaining to offshore
stations.
2.3.3 Documents to be submitted when applying for the 2 nd release
[Doc. No. 220] Design basis - updated
[Doc. No. 221] Final design corrosion protection (please refer to Appendix 6)
[Doc. No. 222] Verification report and certificate of conformity pertaining to Docs. No. 220
and 221
[Doc. No. 223] Final design of the primary and secondary support structures
[Doc. No. 224] Verification report and certificate of conformity pertaining to Doc. No. 223
2.3.4 Installation manual
The approval holder is responsible for ensuring that an installation manual is compiled. The
aim of this installation manual is to clearly illustrate all the processes involved together with
their technical boundary conditions. The respective phases shall be described in sufficient
detail so as to allow the appointed inspector to check the feasibility and logistics of the
project.
The section covering the installation phase provides a comprehensive and transparent de
scription of all steps involved in the implementation concept for installing the offshore struc
ture from leaving the base port to arriving at the construction site.