accessibility__skip_menu__jump_to_main

Volltext : Functional scope and model of integrated navigation systems (BSH-Berichte, Nr. 28)

1.  Assessment  of  the  space  available  (water  depths  bearing  in  mind  tides,  channel
widths,  overhead  clearances)  with  the  aid  of  dimensions  or  the  space  requirements  of
the  own  ship.
2.  Assessment  of  the  environmental  conditions  to  be  expected  (weather,  currents,  swell,
ice  conditions)  bearing  in  mind  loading  status/stability,  manoeuvring  behaviour  and
strength  of  the  ship.
When  checking  the  track,  the  detailed  course  of  the  track  is  checked,  bearing  in  mind  local  peculiarities.
The  following  criteria  are  of  importance  here:
1.  Checking  whether  the  planned  track  may  be  followed  in  the  light  of  traffic-diverting  arrangements, ­
  sea  marks  and  local  regulations.
2.  Assessing  the  planned  manoeuvre  bearing  in  mind  the  manoeuvring  capabilities,  the
planned  set  speed  and  the  stability  of  the  ship.
3.  Checking  the  stipulated  maximum  transverse  and  longitudinal  deviations  bearing  in
mind  the  safety  and  space  requirements  of  the  ship  and  the  accuracy  of  the  sensor
technology  available.
4.  Checking  the  manoeuvring  limits:  compatibility  with  the  manoeuvring  capabilities  of  the
own  ship  as  well  as  the  parameters  of  the  planned  track.
Since  the  check  on  the  speed/time  profile  takes  account  of  output  data  of  both  route  planning  and  track
planning,  this  area  cannot  be  assigned  to  either  track  checking  or  route  checking.  The  objective  of  this
area  is  to  check  the  planned  set  speeds  bearing  in  mind  the  properties  of  the  ship,  the  hydrographic
boundary  conditions  (particularly  water  depths  available)  and  local  regulations.  Over  and  above  this  it
must  be  demonstrated  that  planned  passage  and  arrival  times  can  be  observed  bearing  in  mind  the
(possibly  corrected)  set  speeds.
2.2.2  Functionalities
From  the  objective  of  the  task  “Checking  the  voyage  plan”  explained  under  2.2  is  obtained  the  list  of
functionalities  necessary  to  fulfil  this  task:
1.  Checking  the  route
1.1  Checking  the  space  available
1.2  Checking  the  meteorological  conditions  to  be  expected
1.3  Checking  the  hydrographic  conditions  to  be  expected
2.  Checking  the  track
2.1  Checking  the  navigability  of  the  track
2.2  Checking  the  planned  manoeuvre
2.3  Checking  planned  maximum  transverse  deviations
2.4  Checking  the  manoeuvring  limits
3.  Checking  the  speed/time  profile
3.1  Checking  the  set  speeds
3.2  Checking  the  fixed  passage  and  arrival  times
            
Waiting...

Nutzerhinweis

Sehr geehrte Benutzerin, sehr geehrter Benutzer,

aufgrund der aktuellen Entwicklungen in der Webtechnologie, die im Goobi viewer verwendet wird, unterstützt die Software den von Ihnen verwendeten Browser nicht mehr.

Bitte benutzen Sie einen der folgenden Browser, um diese Seite korrekt darstellen zu können.

Vielen Dank für Ihr Verständnis.